Bismillah Brick Kiln Session 2026-2027
Active Kiln Session
Session 2026-2027
Database Connection
Connected
Brick Grade Master
6 Standard Grades
Security Posture
Hardened
Technical Architecture Verification Hostinger Shared Hosting Compliant

The Brick Kiln ERP foundation is built on an enterprise-grade modular MVC architecture utilizing native PHP 8.2+, PDO with prepared statements, strict input escaping, and CSRF middleware. No Node.js build step is required at runtime.

Front Controller & Routing

Single entry point (public/index.php) with regex parameter parsing and middleware pipelines.

Perimeter Security

.htaccess denies direct access to app/, config/, database/, and storage/.

Cryptographic CSRF & XSS

Timing-safe token comparison, per-session tokens, and automated HTML escaping via e().

Session & Lock Guard

Strict SameSite/HttpOnly cookies and permanent installer lock via storage/installed.lock.

ERP Implementation Roadmap Phase 1 Complete
Phase Module / Scope Status Target
Phase 0 ERP Foundation, Layout, Routing, Database PDO Layer, Health & Setup Guard Complete Complete
Phase 1 Authentication, Sessions, Role Permissions & Kiln Settings Complete Active Now
Phase 2 Master Data (Yearly Sessions, Standard Brick Types, Units) Ready to Start Next Step
Phase 2 Master Data (Yearly Sessions, Standard Brick Types, Units) Planned Scheduled
Phase 3 Labour & Contractor Management (Piece rates, Advances/Peshgi, Work logs) Planned Scheduled
Phase 4 Raw Material & Fuel Purchases (Coal consignments, Weighbridge slips, Suppliers) Planned Scheduled
Phase 5 Kiln Production Cycles (Molding, Bharai loading, Jalai firing, Nikasi unloading) Planned Scheduled
Phase 6 Inventory Management (Grading: Awal, Dom, Som, Khangar, Pilla, Broken) Planned Scheduled
Phase 7 Buyer Master & Dual Ledgers (Financial Money Ledger + Quantitative Brick Ledger) Planned Scheduled
Phase 8 Sales Dispatch, Delivery Challans, Gate Passes & Vehicle Tracking Planned Scheduled
Phase 9 Cashbook, Safe & Banking, Daily Vouchers, Operational Expenses Planned Scheduled
Phase 10 Executive Reports, Daily Production Sheets, Print/PDF, Backups Planned Scheduled
Environment Status
  • PHP Version 8.3.35
  • Database Driver PDO (MySQL / MariaDB)
  • Installation Lock Sealed
  • Runtime Node.js Not Required (Zero Dep)
  • UI Theme Professional Light • Brick Accent
Setup & Installation
The application is configured and sealed via storage/installed.lock.

Reinstallation through the browser is blocked for security. To re-run the wizard, the lock file must be manually removed on the server.